All articles| All Pictures| All Softwares| All Video| Go home page| Write articles| Upload pictures

Reading number is top 10 articles
云南香格里拉4.7级地震-震中民房受损严重(图)
Suspected guarantee Guangzhou Railway motor car tourists cheap sale of Guangzhou-Shenzhen and more than more than 20 Yuan tickets
逾6成受访者称统一命题可维护高考公平
媒体揭代购产业链-配齐包装盒购物单价钱翻3倍
缅甸总统吴登盛将于27日起访华
国务院公布取消食盐限价 盐价有望小幅下调
李克强抵达圣地亚哥对智利进行正式访问-李克强
Temple on the first hit or the Earth? Foreign media transfer China threat to space
In mianning, Sichuan province has still not fully in the fight against forest fires have been burning for three days
The Ministry of public security announced a national “top ten dangerous area“
Reading number is top 10 pictures
无题
The woman fight much more than men
美丽的少女1
运动的范冰冰3
YangYuYing and ZhengShaoQiu dance on the generous come interest dye-in-the-wood
锄禾日了几个人?
这才是真正的人体艺术5
西游日记4
心有鱼而力不足
So beauty, will let you spray blood1
Download software ranking
Ashlynn Video4
Tram sex maniac 2 (H) rar bag5
《小姨子》英文版22
Professional killers2 for Android
《小姨子》英文版16
《小姨子》英文版37
c#程序设计案例教程
传奇私服架设教程
Tram sex maniac 2 (H) rar bag18
Unix video tutorial10
published in(发表于) 2016/11/24 9:56:02 Edit(编辑)
67 dead, the collapse site project in Jiangxi province with total investment of 7.67 billion

67 dead, the collapse site project in Jiangxi province with total investment of 7.67 billion(江西致67死坍塌事故工地项目总投资达76.7亿)

English

中文

67 dead, the collapse site project in Jiangxi province with total investment of 7.67 billion

Twitter screenshots

[Jiangxi Yichun site collapse phase III project total investment of 7.67 billion] @ Nin released the previously published news, abundant cooling towers in April this year, built in three phases, in Jiangxi province, the largest hyperbolic cooling towers. Intends to build two high 168 m and 135 m in diameter hyperbolic natural draft cooling tower. Cooling towers are in which is discharged through the cooling of hot water cooled after repeated use, upon completion, will save a lot of water resources, to prevent the Gan River to dry up, preserving the ecological balance is important. On June 18 this year, Jiangxi ganneng third-phase expansion project from the construction to the installation phase. Electric three-phase expansion project at stone village West of fengcheng city drum Hill, with a total investment of 7.67 billion yuan, proposed 2 1 million-kilowatt ultra-supercritical coal-fired unit. Two units of production plans at the beginning of the end of 2017, 18 respectively electricity, when the annual electricity generation is expected to be up to 10 billion-kilowatt. Beijing times


(Editors: Biao Guo UN832)
2016-11-24 22:52:06
Integrated
江西致67死坍塌事故工地项目总投资达76.7亿

微博截图

  [江西宜春工地坍塌丰电三期项目总投资76.7亿]据@宜春发布 此前公布消息,丰电三期冷却塔于今年4月开建,为江西省内最大的双曲线型冷却塔。拟建成两座高168米、直径135米的双曲线型自然通风冷却塔。冷却塔是使冷却器排出的热水在其中冷却后重复使用,建成后将节约大量水资源,对防止赣江水干涸、维护当地生态平衡具有重要意义。今年6月18日,江西赣能丰电三期扩建工程建设由土建施工进入安装阶段。丰电三期扩建项目位于丰城市西面石上村铜鼓山,总投资额76.7亿元,拟建2台100万千瓦超超临界燃煤机组。两台机组计划于2017年年底、18年年初分别投产发电,年预计发电量将达100亿千瓦时。京华时报


(责任编辑:郭彪 UN832)
2016-11-24 22:52:06
综合




添加到del.icio.us 添加到新浪ViVi 添加到百度搜藏 添加到POCO网摘 添加到天天网摘365Key 添加到和讯网摘 添加到天极网摘 添加到黑米书签 添加到QQ书签 添加到雅虎收藏 添加到奇客发现 diigo it 添加到饭否 添加到飞豆订阅 添加到抓虾收藏 添加到鲜果订阅 digg it 貼到funP 添加到有道阅读 Live Favorites 添加到Newsvine 打印本页 用Email发送本页 在Facebook上分享


Disclaimer Privacy Policy About us Site Map

If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.