All articles| All Pictures| All Softwares| All Video| Go home page| Write articles| Upload pictures

Reading number is top 10 articles
Guangzhou Baiyun District Committee member Liu Jiansheng for bribery and sentenced to 9 years
政协委员:公立医院改革严重滞后是看病贵症结-看病贵-看病难
The Central Military Commission: armed forces and armed police in full 3 paid service is stopped
女孩被美国妈妈收养 20多年后找到亲生父母(图)
Last year total profit 82.47 billion yuan, down Super 50%
听非洲朋友讲述习近平主席的故事
People from all walks of life bid farewell to peace-keeping in Jilin martyrs Shen Liangliang
优秀县委书记李树起升任副部 被誉解决问题能手
Legislative caucus: Democratic Progressive Party does not waste the “Taiwan independence“ party platform is not telling the truth
河北陕西1市2县争夺百亿矿产 数万民众签字申诉
Reading number is top 10 pictures
运动的范冰冰2
A man's favorite things12
Startling Russian girl blind date scene2
谁认识这位校花
Fan bingbing black wings for platform and DanLuoWang believes beauty1
A resort photographed beautiful young woman change clothes process vomiting blood2
中国处女图鉴2
美洲杯宝贝的雨中风情2
看看什么叫美景
Sell the barbecue as says father du breul3
Download software ranking
1400篇各类破解文章
尖东毒玫瑰A
Sora aoi‘s film--Lust fan wall
I'm come from Beijing2
Unix video tutorial18
Boxer vs Yellow2
WebService在.NET中的实战应用教学视频 → 第5集
Call Of Duty5
Unix video tutorial12
linux初级教程
published in(发表于) 2016/8/20 19:24:39 Edit(编辑)
Students apply for public investment in billions of Wuhan drainage, Wuhan water authority response

Students apply for public investment in billions of Wuhan drainage, Wuhan water authority response(大学生申请公开武汉百亿排水投资,武汉水务局回应)

English

中文

Students apply for public investment in billions of Wuhan drainage Wuhan water authority response

Wuhan 3 years ago said it would invest 13 billion improving the drainage capacity of the city, this year's flood has been "in front of the sea."


Nationality students of Beijing Normal University in Wuhan, Wang to the Wuhan water Bureau mailed a copy of the application for disclosure of Government information, public information on plans to invest 13 billion yuan to improve drainage.



On August 20, the surging News (www.thepaper.CN) from Wang Office was informed that she had gleaned from August 15, got the Wuhan water Bureau.


Wuhan water Bureau said in reply, since 2013, the Department is directly responsible for more than more than 200 drainage facility construction project in Wuhan City on 13, "in addition to cancel 1 item, the rest 12 projects had been completed."

Wuhan water authority response

Reply, the Wuhan water Bureau, also attached to the Department is responsible for 13 projects construction costs statistics, investment estimation of 13 projects totaling 849 million Yuan, in addition to investment is 100 million Yuan "large culvert in the city canal dredging project (fourth)" is canceled, the rest 12 projects completed, completed investment of 666 million Yuan.


Wuhan water Bureau, said Wang to get the other not by the organs in charge of "since 2013 investment total cost of the construction of drainage facilities, as well as the specific funds and the amount of parts facilities," Government information "does not belong to the scope of the public rights and responsibilities."


According to Wang introduced, she was on August 15, got the reply file, return of the Wuhan water Bureau documents postmarked on August 1, "within the statutory time limit for a reply".


In 2013, the Wuhan, Wuhan Water Authority announced the construction of drainage facilities in the Center three-year plan of action for critical, saying that through 3 years of hard work, investment of 13 billion yuan, the perfect system, overall improvement of drainage capacity of drainage system. There were media reports "Wuhan invested 13 billion bid farewell to ' the sea ', day 15 East Lake is also not afraid."


After severe waterlogging caused by heavy rains in July, the plan enough to keep questioning.


King of July when they submit information disclosure a surging news that, "these days, I always pay attention to the home situation, due to heavy rain and water led to my coming back plan has suffered repeated delays. Last (6th) I learned that water Department three years ago, had planned a three-year investment of 13 billion yuan to improve the drainage capacity ... ... Application for disclosure of this information. ”


Wuhan, but there are also many local people think that serious waterlogging in Wuhan this year is due to the short period of precipitation is too large, and many of the old submerged water receded fairly quickly. Chu on July 6 reported that more than 4 billion yuan into the drainage works, plays a large role in the rain, many old waterlogging did not "see the sea" road in the Center no longer "see the sea", in addition to outside the South Lake area, roads waterlogged basic moves out of the central city.


(Editors: Xu Yonggang UN006)
2016-08-20 15:05:45
Surging
大学生申请公开武汉百亿排水投资 武汉水务局回应

  武汉3年前宣称将投资130亿提高城市排水能力,今年汛期却遭遇“门前看海”。


  武汉籍的北京师范大学学生王某因此向武汉市水务局邮寄了一份政府信息公开申请书,申请公开关于计划投资130亿元改善排水设施的相关信息。



  8月20日,澎湃新闻(www.thepaper.cn)从王某处获悉,她已于8月15日拿到武汉市水务局的回函。


  武汉水务局在回函中称,2013年以来,该部门直接负责武汉市200多个排水设施建设项目中的13项,“除取消1项外,其余12个项目已经全部完成”。

武汉市水务局的回函

  武汉水务局在回函中还附上了该部门负责的13个项目的建设费用统计表,13个项目投资估算总计8.49亿元,除投资估算为1亿元的“全市大型骨干管涵渠清淤疏浚项目(第四期)”取消外,其余12个项目全部完工,已完成投资6.66亿元。


  武汉水务局还表示,王某要求获取的其他非由该机关负责的“2013年以来已投资排水设施建设费用总额,以及具体开支款项和各部分设施建设的金额数目”的政府信息,“不属于本机关公开职责权限范围”。


  另据王某介绍,她是在8月15日拿到回函文件,武汉水务局的回函文件邮戳是8月1号,“在法定期限内给了回复”。


  2013年,武汉市水务局公布《武汉市中心城区排水设施建设三年攻坚行动计划》,称准备通过3年努力,投资130亿元,系统完善排水体系、整体提高排水能力。当时有媒体报道称“武汉投资130亿告别‘看海’,一天下15个东湖也不怕”。


  在7月份的暴雨造成严重内涝后,上述计划饱守质疑。


  7月份提交信息公开申请时王某曾向澎湃新闻表示,“这几天我时刻关注家乡灾情,由于暴雨和积水导致我暑假回家计划一再拖延。昨天(6日)我得知水务局三年前曾计划三年投资130亿元提高排水能力……所以申请这个信息公开。”


  但同时也有不少武汉本地市民认为,今年武汉内涝严重是由于短时期内降水量过大,且许多老的渍水点积水消退也较快。荆楚网7月6日也报道称:这40多亿元建成的排水工程,在这次暴雨中起到了大作用,许多老渍水点并没有再“看海”,中心城区道路不再处处“看海”,除南湖区域外,道路渍水点基本移出了中心城区。


(责任编辑:徐永刚 UN006)
2016-08-20 15:05:45
澎湃




添加到del.icio.us 添加到新浪ViVi 添加到百度搜藏 添加到POCO网摘 添加到天天网摘365Key 添加到和讯网摘 添加到天极网摘 添加到黑米书签 添加到QQ书签 添加到雅虎收藏 添加到奇客发现 diigo it 添加到饭否 添加到飞豆订阅 添加到抓虾收藏 添加到鲜果订阅 digg it 貼到funP 添加到有道阅读 Live Favorites 添加到Newsvine 打印本页 用Email发送本页 在Facebook上分享


Disclaimer Privacy Policy About us Site Map

If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.