All articles| All Pictures| All Softwares| All Video| Go home page| Write articles| Upload pictures

Reading number is top 10 articles
双创周上总理握了谁的手?
中央气象台发布暴雨蓝色预警 建议注意防灾
教师心酸辞职信走红网络:薪酬不能持家 -辞职信
中央机关年内将拍卖5000辆公车-公车改革
上海今年高中招生录取率预计为98%-上海
王珉张宝顺履新全国人大 2人先后卸任辽皖省委书记
冯正霖任民用航空局党组书记 李家祥不再担任
吉林一煤矿发生事故已致2人遇难10人失联-瓦斯
美媒-中国“鬼城”荒无人烟 像废弃电影布景-鬼城
美军两艘攻击舰同时现身中国东海南海(图)-攻击舰
Reading number is top 10 pictures
The world first motorcycle will be auctioned for 21000 pounds
初吻给了谁?
大四女生借债隆胸成功
The goddess of the single reason2
Forced sex girl living abroad1
Nine school beauty star those gossip matters
Forced sex girl living abroad2
这酸爽,让人不敢相信
Ashlynn Brooke show proud chest measurement3
战场废物1
Download software ranking
Unix video tutorial5
WebService在.NET中的实战应用教学视频 → 第1集
Such love down(擒爱记)
Tram sex maniac 2 (H) rar bag14
Boxer Classic video3
SQL2000 For 4IN1
美女写真1
Tram sex maniac 2 (H) rar bag5
Kung fu panda - the secret of the teacher
Professional killers2 data package
published in(发表于) 2016/6/25 11:58:26 Edit(编辑)
11th mission Shenzhou astronaut crew have completed optional

11th mission Shenzhou astronaut crew have completed optional(神舟十一号任务航天员乘组已完成定选)

English

中文

11th mission Shenzhou astronaut crew have completed optional | long seventh _ news

Xinhua News Agency, Hainan, Wenchang June 25 (reporters Li Guoli and and Mei Changwei and and Chen Xi)-wuping 25th, Vice Director of China manned space Engineering Office at the long seventh rocket flight mission said at a news conference, 11th mission Shenzhou astronaut crew have completed will be selected.


Wu Ping is in the space lab mission arrangements and issued at the successor organization of preparation and planning of this message.


According to reports, the 2010 Central Government approves construction of the space station, space lab and the construction of space station research carried out in two stages. Space lab mission objectives are: interim breakthrough and grasp the carriage of goods and supplies, the astronauts reside, the ground mission support and protection technology for a long time, space scientific experiments of larger scale and technical tests carried out, for the space station construction and operation experience.


Wu said that to meet the space lab mission requirements, the space laboratory converted the temple on the second space laboratory was developed, new long seventh carrier rocket is developed, a cargo ship and applied load, to develop and produce a long second FT2, 11th away 11 rockets and Shenzhou spacecraft and built long seventh in Wenchang, Hainan spaceport launch stations and related facilities and equipment.


According to mission, space lab mission out 4 sorties the long seventh carrier rocket for the first time after the mission a complete success, subsequent 3 missions are as follows: in mid-September, launch second space laboratory in mid-October, 11th launch Shenzhou manned spacecraft in mid-November, returned Shenzhou 11th class implementation returns in mid-April 2017, launch days the boat is first cargo spacecraft.


At present, follow-up tasks preparation goes well, as planned. Among them, the temple on the second space laboratory manned spacecraft, Shenzhou, 11th, and supporting the long second f carrier rocket has completed factory testing; 11th mission Shenzhou astronaut crew have completed election, ongoing tasks to strengthen training days the boat is first cargo spacecraft and the long seventh away two rockets being developed production and Assembly testing. (End)



Responsible editor: Qiao Leihua SN098





Article keywords:
Long seventh

I want feedback
Save a Web page
Xinhua News Agency
神舟十一号任务航天员乘组已完成定选|长征七号_新闻资讯

  新华社海南文昌6月25日电(记者李国利、梅常伟、陈曦)中国载人航天工程办公室副主任武平25日在长征七号运载火箭首飞任务新闻发布会上说,神舟十一号任务航天员乘组已完成定选。


  武平是在介绍空间实验室任务整体安排,以及后续任务准备和计划安排情况时发布这一消息的。


  据介绍,2010年中央批准实施空间站工程,分空间实验室任务和空间站研制建设两个阶段实施。空间实验室阶段的任务目标是:突破和掌握货物运输 和补给、航天员中期驻留、地面长时间任务支持和保障等技术,开展较大规模的空间科学实验与技术试验,为空间站建造和运营积累经验。


  武平说,为满足空间实验室飞行任务要求,空间实验室阶段改装研制了天宫二号空间实验室,新研制了长征七号运载火箭、货运飞船和应用载荷,研制生产了长征二号FT2、遥十一火箭和神舟十一号飞船,并在海南文昌航天发射场新建了长征七号运载火箭发射工位及相关设施设备。


  根据任务目标,空间实验室任务共安排4次飞行任务,长征七号运载火箭首次飞行任务圆满成功后,后续3次飞行任务分别为:9月中旬,发射天宫二号空间实验室;10月中旬,发射神舟十一号载人飞船,11月中旬,神舟十一号返回舱实施返回;2017年4月中旬,发射天舟一号货运飞船。


  目前,后续各项任务准备工作进展顺利,正按计划推进。其中,天宫二号空间实验室、神舟十一号载人飞船,以及配套长征二号F运载火箭已完成出厂测 试;神舟十一号任务航天员乘组已完成定选,正在进行任务强化训练;天舟一号货运飞船和长征七号遥二火箭正在研制生产和总装测试。(完)



责任编辑:乔雷华 SN098





文章关键词:
长征七号

我要反馈
保存网页
新华社




添加到del.icio.us 添加到新浪ViVi 添加到百度搜藏 添加到POCO网摘 添加到天天网摘365Key 添加到和讯网摘 添加到天极网摘 添加到黑米书签 添加到QQ书签 添加到雅虎收藏 添加到奇客发现 diigo it 添加到饭否 添加到飞豆订阅 添加到抓虾收藏 添加到鲜果订阅 digg it 貼到funP 添加到有道阅读 Live Favorites 添加到Newsvine 打印本页 用Email发送本页 在Facebook上分享


Disclaimer Privacy Policy About us Site Map

If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.