All articles| All Pictures| All Softwares| All Video| Go home page| Write articles| Upload pictures

Reading number is top 10 articles
云南警方回应民警击毙持斧头男子-正当履行职务
Chinese Foreign Minister Yang Jiechi met with Belgium’s Deputy Prime Minister and Foreign Minister Reynders
酒店经理称女子遇袭事件是炒作 如家回应-女子酒店遇袭-和颐酒店
Qiandongnan in Guizhou province Communist Party Secretary Wang Jiaqian survey
李克强双创周打破议程上台即席讲话 -李克强
Conducive to curbing corruption of cadres housing the residence, to avoid waste of resources
习近平会见法国总统奥朗德(图)-习近平-奥朗德
食药监司长-大量疫苗流入非法渠道 监管有漏洞
国家海洋局-天津港周边海域海水未见异常-国家海洋局
黑龙江呼玛县发生两起溺水事件 7人死1人失踪-呼玛县
Reading number is top 10 pictures
谁认识这位校花
关于提肛的健身效果
More attractive than sora aoi3
Sora aoi mirror memorial classics2
怀春少女-石一伊
Ashlynn Brooke a group sexy photo2
yy365网站上的美女2
Wild animals melee moment of life and death2
联通的3G无线网卡我只用了一天,看看流量......
这酸爽,让人不敢相信
Download software ranking
jdk1.6 for windows
Kung.Fu.Panda.2
Take off clothes to survival
双旗镇刀客A
Unix video tutorial18
Rio big adventure
Unix video tutorial8
豪门浪荡史
实战黑客不求人
Tram sex maniac 2 (H) rar bag18
qq published in(发表于) 2014/7/5 8:38:03 Edit(编辑)
Huaibin, Henan invested 14.8 million station opened a year cannot be used

Huaibin, Henan invested 14.8 million station opened a year cannot be used

Huaibin, Henan invested 14.8 million built station | station cannot be used a year _ news

Xinyang, newspaper "spent more than 10 million a station, this thought won't be short of water. But station was built a year, (the dry season) did not have a drop. "A few days ago, huaibin Zhang Zhuang Xiang village villagers reflected this situation to the press. Case, please? If that is true then what is it? River reporter interviewed him.


  Villagers | station built a year, available water intakes above water


Yesterday, the Dahe newspaper reporter in huaibin County hog City station project area (pictured above), water intake and water intake points, essentially flat water of the huaihe River, the river cannot flood gates. Nearby villagers said some time ago heavy rains in xinyang, after rivers rose sharply, is the situation; usually station water intake more than half a meter higher than the water.


Around the station, the reporter saw, due to lack of water, and part of nearby farmland awaiting Planting water, others have planted seedlings also are waiting for new water irrigation.


Jiuli village villagers old said: "station built has near 3 years, last year in March or April built, just catch xinyang for decades years a met of high temperature drought weather, people are think station fix has, can pumping irrigated has, didn't thought take water mouth is than River high has a big cut son, river point are flow not into gate in, fundamental didn't approach with......" eventually, last year pig arch City station around 7 a village of 20,000 over acres farmland, due to no water irrigation sharply production, part crop crops.


"This year's planting season was nearly over, our village there is no plug seedling because of water shortage in many fields. "The villager Li says with resignation.


Villagers said that the station is completed, because there is no water, station every door closed, helpless villagers had to dig myself pumped for irrigation, "we drill wells pumping, got to spend hundreds of dollars at a time, cost is very high."


  Investigative journalism | station project investment of 14.8 million


Subsequently, the reporter in huaibin County Government information online, hog town station renovation and refurbishment schemes estimates a total investment of 14.8 million dollars. Among them, the demolition and reconstruction first station station, updated equipment such as pumps, motors, rebuild pump and hydraulic structures, such as, invested 12 million Yuan and recovery, repair irrigation channel 5 station km branch Canal 20 kilometers, 60 of supporting buildings and so on, 2.8 million Yuan investment.


Villagers also told reporters that the station is drought relief project, but ahead of the rainy season "acceptance", "last fall, take to the water when the river rose in flood season, there was a lot of leadership to the site, there are a lot of reporters to take pictures. Later we learned that station through acceptance. "


  Remedies | remove inlet channel renewal is preferred


In this regard, photo Party Secretary Li Xinrui, huaibin said station can't pump uses do exist, the village could do nothing about this, and has repeatedly offered the County departments.


Huaibin County Water Conservancy Bureau Chief of the agricultural unit breaks explained that less precipitation over the years, low water level of the huaihe River, so there is no way to get to the water. This project consists of xinyang city water conservancy survey and Design Institute, programme by the huaihe river water resources Committee, was built by construction units according to the drawing, design and construction problems, the acceptance of the project by the National Ministry of water resources.


Depending on which units are responsible for the funding of the project, construction and acceptance? Xinyang City Office said the water conservancy survey and Design Institute, the project designed by multiple departments in partnership, design is unclear. Station at design time, to normal level used as a reference for many years, run into special drought year, river water, station will not be able to take water and a water pump. However, this may have to do with infrastructure, but off.


Huaibin County, while an professionals thought we haven't engaged in water conservancy project, the designer of the project may not have been caused by sedimentation, sand river beds drop comprehensive factors into account such as, resulting in design intake higher than the dry season in dead storage level, such natural can't pump station. In addition, the construction company it doesn't change the problems found in the construction design drawings, problems in construction of supervision has not timely feedback.


So, the current situation can be remedied? Who said the station has been repaired stereotypes, only for the demolition and reconstruction of water channels, "or when the wet season, from the station pumped storage pond, need a water refill, but this rule was temporarily, not permanently."


(Original title: built station into a drought year could not be used)

(Edit: SN146)
12:33 July 05, 2014 Dahe


添加到del.icio.us 添加到新浪ViVi 添加到百度搜藏 添加到POCO网摘 添加到天天网摘365Key 添加到和讯网摘 添加到天极网摘 添加到黑米书签 添加到QQ书签 添加到雅虎收藏 添加到奇客发现 diigo it 添加到饭否 添加到飞豆订阅 添加到抓虾收藏 添加到鲜果订阅 digg it 貼到funP 添加到有道阅读 Live Favorites 添加到Newsvine 打印本页 用Email发送本页 在Facebook上分享


Disclaimer Privacy Policy About us Site Map

If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.