All articles| All Pictures| All Softwares| All Video| Go home page| Write articles| Upload pictures

Reading number is top 10 articles
四川省成都市市长助理陈争鸣接受组织调查
Shenzhen proposed “orphan island“ to improve the survival rate of Baby Buzz
各地公安机关和教育部门严厉打击涉考违法犯罪
新闻早点-北京最严控烟条例今起实施-控烟条例-MERS
新疆克拉玛依市大西沟平房火灾6人遇难2人受伤
Langzhong, Sichuan Government Information Office for suicides release notes
湖北孝感发生交通事故致9死11伤-交通事故
副局长冒充纪委官员约谈举报人 这是有多想不开
北京丰台再现高价地块 房价最高或超10万每平米-房价
李玉杰鞠新春分任南海舰队参谋长、装备部部长
Reading number is top 10 pictures
The real super beauty4
一万二一支的万珂,用得真心肉疼。
In the world the most mysterious 21 place landscape3
乳娘帕梅拉安德森5
分手的感悟
Sora aoi mirror memorial classics4
世界五大海盗
The hot big eye big breast beauty2
到底是谁撞谁呀?
Sora aoi after swimming
Download software ranking
仙剑奇侠传98硬盘WINXP版
Tram sex maniac 2 (H) rar bag4
DreamWeaver8
卡丁车单机版
Unix video tutorial2
金山office2007
Unix video tutorial15
Unix video tutorial17
Dance with duck(male prostitution)
传奇私服架设教程-chm
qq published in(发表于) 2014/6/6 9:07:03 Edit(编辑)
States to speed up the recovery of nuclear power: Weihai invest 42.3 billion will start

States to speed up the recovery of nuclear power: Weihai invest 42.3 billion will start

States to speed up the recovery of nuclear power: 42.3 billion investment in Weihai projects | | Fukushima nuclear power States _ the commencement news

Lin Chunting


Nuclear power an increasingly rapid pace of recovery.


Official website of the Ministry of environmental protection, 3rd news release, being the major large-scale advanced PWR nuclear power station CAP1400 demonstration project (site selection stage) environmental impact report (hereinafter referred to as the environmental report), publicity, publicity for 9th June 3 ~6 month.


The environment report shows that the project planning and construction of two CAP1400 PWR nuclear power unit, by State nuclear demonstration power plant limited liability company responsible for construction and operation management. Projects with a total investment of about $ 42.3 billion yuan, which features about 3.43 billion yuan of investment, accounted for a total investment of 8.12%. Decommissioning fund based on extraction of 156 million yuan per year.


The project, located in rongcheng city, Weihai city streets by ningjin Shandong province shidao Bay site in Southeast. Shidao Bay site about 120km from the Yantai City in the Northwest, and Northwest from Weihai is about 68km, about 23km from the rongcheng city in the Northwest.


Aforementioned project capital by the State nuclear power technology Corporation (hereinafter referred to as "national nuclear power") and China Huaneng group according to the pay raise, funds through bank financing outside the capital.


Wang Binghua, Chairman of State nuclear power on May 29 by the national nuclear power and United States Westinghouse AP/CAP qualified suppliers annual meeting to be held, said the policy of restarting nuclear power construction in China has been proved. "Our country has already formed such models 6~8 of equipment material supply capacity per year, has formed a global, AP/CAP shared by three generations of nuclear power at home and abroad-oriented supply chain. "He said.


Introduce Wang Binghua, currently CAP1400 preliminary design has been through the national review, construction designs completed by about 65%. Planning in rongcheng, Shandong province shidao Bay construction CAP1400 two units at the upfront work is progressing well, and is expected to start within this year, in 2018, the first grid-connected power generation units.


Country nuclear pressure water heap model engineering is national medium-and long-term science and technology development planning platform for (2006~2020) under determines of 16 a major technology special one, its main task and overall target is: in national has determines of AP1000 three generations nuclear power technology of based Shang for digestive, and absorption, full master to non-dynamic technology for logo of third generation nuclear power technology, and further research development out has my autonomous intellectual property of large advanced pressure water heap technology, built large advanced pressure water heap plant major special The CAP1400 demonstration project.


Qu Dazhuang Vice President of national nuclear power suppliers annual meeting on May 29, said follow-up CAP1400 demonstration power plant construction, equipment localization rate of more than 80%.


Qu Dazhuang also indicated that, at present, three generations of nuclear power equipment supply chains have excellent manufacturing capacity: covered not only the main equipment, as well as auxiliary equipment and materials supply equipment involves not only the nuclear Island equipment type, as well as conventional Island equipments not only domestic suppliers, there are a number of foreign enterprises.


National and Westinghouse nuclear power cooperation passive third-generation pressurized water reactor nuclear power technology to the global market reached a consensus: international marketing development of the AP1000, West of housing companies, national nuclear power and the Chinese side enterprise support CAP1400 develops international market, dominated by State nuclear power, Westinghouse and the foreign enterprise support.


According to our understanding, China is also the world's first third-generation advanced pressurized water reactor-AP1000 nuclear power units--Zhejiang sanmen nuclear power station unit 1th, planned for grid-connected power generation by 2015.


China plans to increase nuclear power capacity. Released by the NDRC on May 16 the strengthening of air pollution prevention and control in the energy industry work programme proposed to "safely and efficiently promote construction of nuclear power". When the target is 2015 years of nuclear power generating capacity of over 200 billion-kilowatt, and strive to the end of 2017, when years of nuclear power generating capacity of over 280 billion-kilowatt. Cumulative 2013, China's nuclear power generating capacity is only 110.71 billion kWh.


Three years ago, Japan Fukushima, allows people to doubt the safety of nuclear power. However, at a press conference held at the information Office of the State Council on June 4, Vice Minister of environmental protection, the national nuclear security administration director Li Ganjie introduced 30 of China's nuclear power development, smoothly in General, health and safety.


"Up to now, China has built, inputs of merchant shipping of nuclear power units in 19 and 29 sets of nuclear power units under construction, with a combined 48, have ranked on this scale in the world. "Li Ganjie said," overall, the quality of the nuclear power plant under construction in China has been effectively controlled, has been running nuclear power units maintained a relatively good safety performance. 30, the US there have been no secondary events and more than two runs. ”


(Original title: national nuclear power projects with a total investment of Weihai 42.3 billion unit construction is expected to start this year)

02:21 June 06, 2014 First financial daily


添加到del.icio.us 添加到新浪ViVi 添加到百度搜藏 添加到POCO网摘 添加到天天网摘365Key 添加到和讯网摘 添加到天极网摘 添加到黑米书签 添加到QQ书签 添加到雅虎收藏 添加到奇客发现 diigo it 添加到饭否 添加到飞豆订阅 添加到抓虾收藏 添加到鲜果订阅 digg it 貼到funP 添加到有道阅读 Live Favorites 添加到Newsvine 打印本页 用Email发送本页 在Facebook上分享


Disclaimer Privacy Policy About us Site Map

If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.