All articles| All Pictures| All Softwares| All Video| Go home page| Write articles| Upload pictures

Reading number is top 10 articles
北京发布雷电蓝色预警 大部分地区有雷阵雨(图)
李嘉诚父子海外投资版图
浙江警察被曝有69套房续-举报人称其敲诈丈夫
Report: China’s air quality situation is still grim
习近平会见全国优秀县委书记:要做政治的明白人
广西3人张贴法轮功宣传品获刑 宣传册发到小学
The SASAC: enterprises such as concealed removed by the head of the accident investigation
英驻华使馆称收到圣诞节三里屯威胁信息-三里屯
河北大名县5名小学生意外溺亡-小学生溺亡-溺亡
广东超生儿10分钟顺利入户 仍要缴社会抚养费-黑户入户
Reading number is top 10 pictures
美丽的少女1
The little girl with long hair3
NeedWallpaper7
Go to the national museum2
壮丽的云彩2
Sora aoi on twitter2
Ashlynn Brooke a group sexy photo3
Sell the barbecue as says father du breul1
接财神,大吉大利,财源滚滚来
Sora aoi mirror memorial classics1
Download software ranking
Boxer vs Yellow3
打鸟视频
linux初级教程
双旗镇刀客B
塘西风月痕
Unix video tutorial11
Boxer's Top ten classic battle8
Boxer's Top ten classic battle1
Eclipse 4.2.1 For Win32
Tram sex maniac 2 (H) rar bag14
qq published in(发表于) 2014/6/4 9:37:25 Edit(编辑)
First high-speed rail joint test in Xinjiang, wind engineering anti-17 wind

First high-speed rail joint test in Xinjiang, wind engineering anti-17 wind

Xinjiang's first high-speed rail joint test wind project-17 wind-resistant | high speed rail | wind project in Xinjiang _ news

Urumqi, PRC, June 4 (Li Xiaoxiao), 3rd 9:50 A.M., as slowly out of Urumqi train CRH2-061C train crash testing vehicles used, blue (State) new (frontier) railway second double line in Xinjiang (hereinafter referred to as LAN-Xin second Xinjiang section) began joint test, which marked the opening of this section of the railway operation has entered the countdown stage.


According to the Lanzhou-Xinjiang railway second double line introduced fulian, Chief Engineer with the FBI test item, the FBI test was mainly through professional lines to run the test train test trains covering catenary engineering, railway signal and communication engineering, passenger service information system.


Lanxin line 710-kilometre section of Xinjiang, design speed of 250 km, to start construction in March 2010, is the first high-speed railway in Xinjiang. "4 years, the units involved to overcome along the routes across the Gobi desert, prone to extreme weather and other difficulties, construction of scientific organizations, overcome a wind project, a number of railway construction in the world problems, ensure the project went ahead. "Construction of the Urumqi railway Bureau Director Liu Xinle, told reporters.


Due to the special geographical conditions in Xinjiang and the windy weather cause line of smoke passing through DUN, Barry, 30, of dabancheng the four winds area, is in China and one of the worst disaster areas. Parts sector average is greater than 8 winds up to 208 days, maximum wind speeds of up to 60 mph, the equivalent of 17 wind.


Construction, railway construction departments will ultimately determine the subgrade of wind-break wall, windshield, wind-Myeong-dong is the main type of bridge wind engineering. According to reports, the lanxin line scale wind project in Xinjiang in China's high-speed railway construction in the first place, 462-kilometre project, Xinjiang section total route length of 65%.


It is learnt that the lanxin line in Xinjiang or opening operation before the end of 2014, which will work with existing Lanzhou-Xinjiang railway and Longhai, back-to-back baolan railway, forms radiates a wider range, population more West rail transport network. Motor car after opening the line, from Urumqi to Lanzhou, running time will be shortened from 20 hours to 8 hours, from Urumqi to Hami also takes about 2 hours or so.

(Edit: SN091)
00:11 June 04, 2014 People's daily online


添加到del.icio.us 添加到新浪ViVi 添加到百度搜藏 添加到POCO网摘 添加到天天网摘365Key 添加到和讯网摘 添加到天极网摘 添加到黑米书签 添加到QQ书签 添加到雅虎收藏 添加到奇客发现 diigo it 添加到饭否 添加到飞豆订阅 添加到抓虾收藏 添加到鲜果订阅 digg it 貼到funP 添加到有道阅读 Live Favorites 添加到Newsvine 打印本页 用Email发送本页 在Facebook上分享


Disclaimer Privacy Policy About us Site Map

If you have any requirements, please contact webmaster。(如果有什么要求,请联系站长)
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.