All articles(网络文学目录) All Pictures(图片目录) All Softwares(软件目录)

 
Kunming Railway Administration railway Rob shuihong, train operation resumed on 8th

Writer: aaa Article type: The daily news(新闻时事) Time: 2014/9/8 11:41:17 Browse times: 156 Comment times: 0

Kunming Railway Administration railway Rob shuihong, train operation resumed on 8th


Head photo

Go homepage
Upload pictures
Write articles

Rob shuihong railway trains 8th of Kunming Railway Administration operated normally | | shuihong railway repair opening _ news

CNS, Kunming, September 8 (reporters Wang Yanlong and Yao Ruilin)-8th from the Kunming railway Bureau was informed that shuihong railway is currently affected by the flood have been Rob, mountain slide collapsed affecting shuihong severed rail lines and bypass operation of passenger trains, restore the normal operation since September 8.


September 5, under the influence of heavy rainfall, and shuihong Pine River camp railway station between multiple lines damaged, by means of the interval train services are affected.


After the flooding occurred, the railway Ministry has launched an emergency plan, fully organizing forces to rescue, and on some trains to take a detour or adjust modes of transport to ensure that water damage on the transport order to minimize the impact.


After emergency workers battled, September 7, at 22 o'clock, repair shuihong Pine River camp railway station between water lots opened, and opened in 8th at 2 o'clock in the morning to run. (End)


(Original title: Rob shuihong railway trains in Queensland Rail tube 8th returned to normal operation)


(Edit: SN117)
17:22 on September 08, 2014
China News Network




There are 0 records,
Comment:
Must be registered users to comment(必须是注册用户才能发表评论)

Disclaimer Privacy Policy About us Site Map
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.