All articles(网络文学目录) All Pictures(图片目录) All Softwares(软件目录)

 
Organs of State cultural relics Bureau official micro-blog to respond to canteen green issues

Writer: qq Article type: The daily news(新闻时事) Time: 2014/6/4 9:40:09 Browse times: 287 Comment times: 0

Organs of State cultural relics Bureau official micro-blog to respond to canteen green issues


Head photo

Go homepage
Upload pictures
Write articles

Organs of State cultural relics Bureau official micro-blog in response to the cafeteria environment | | surprise inspections _ National Heritage Board canteen news

State Bureau of cultural relics has always attached importance to environmental protection, in construction of office building in strict compliance with the relevant environmental requirements. Nearby residents last year reflected the network room air conditioner outdoor unit I have noise, I value, timely and authoritative testing institutions designated by the environmental protection departments were determined, the test results show no excess. Having said that, I still actively pursuing clean air conditioning noise reduction measures such as fan blades, replacement shock pad and let a professional corporate design advanced soundproofing in order to further reduce noise from air conditioning. To date, I have not receive reflect the surrounding residents.

On May 27 this year, personnel requirements related to me, Dongcheng District, Beijing environmental protection Bureau-computer room air conditioning noise in outdoor unit to conduct on-site inspections, but refused to produce documents. On May 29, I specifically sent to the communication, Dongcheng District, Beijing environmental protection Bureau, actively cooperate with the environmental protection agency testing.

June 4 at 10 o'clock in the morning, led reporters, Dongcheng District, Beijing environmental protection Bureau-related personnel Bureau conducted surprise checks on me, but not for the outdoor unit of air conditioner noise, but for me the canteen fume filtration equipment, in view of the large numbers of people in my Council gathered at the main gate, severely disrupted order in the Office, I field workers require reporters to produce documents, but failed to produce and, therefore, does not allow reporters into the Office area. After consultation with the staff, Dongcheng District, Beijing environmental protection Bureau, agreed that afternoon my canteen fume filtration equipment to conduct on-site inspections. After reviewing the results, I will inform the public in a timely manner and accept media supervision.

For individual staff members referred to in media reports, scornful, as verified, I will serious criticism of education.

(Original title: about the State Bureau of cultural relics authorities environmental issue report respond to the canteen)

17:02 June 04, 2014 State Bureau of cultural relics official micro-blog




There are 0 records,
Comment:
Must be registered users to comment(必须是注册用户才能发表评论)

Disclaimer Privacy Policy About us Site Map
Copyright ©2011-
uuhomepage.com, Inc. All rights reserved.